Menu Content/Inhalt
  • English
  • Español
News 2000a

Calar Alto Computer News for January to June 2000

 

1. Hardware 

  • The Calar Alto Network has been improved with the addition of 3 Giga Switches. Now 2.2m, 3.5m and Laboratory are connected with 1Gbps bandwidth. 1.23 is connected with 100Mbps
  • Laboratory has now a more switched network allowing more bandwidth for end users
  • Jobs for allowing 10 modems for remote PPP connections has been started.

 

2. Software

  • New IRAF version without the Y2K bug. Version is 2.11.3
  • StarOffice 5.1 suite installed for general use at Solaris
  • Secure shell (ssh) installed
  • Obseving accounts obs1a to obs3b have been unified, protecting configuration files
  • New Data Base for Night Reports has been built on the system. All night reports will be stored and can be consulted any time
  • Meteorological data has been inserted into EPICS1
  • NTP (Network Time Protocol) has been installed on all instrumentation computers
  • ds9 installed

 

3. Personnel

  • We have a new coleague on the Computer group. Ricardo Hernández started up on May 29th